Alberta Avenue

Alberta AvenueOwner                         City of Edmonton

Four-year project started in the spring of 2019, consisting of residential roadway rehabilitation work with a contract value of over 30 million dollars.  The project boundaries are from 111 Avenue to 122 Avenue and from 89 street to 97 street.

Project Scope:

–           Act as prime contractor for multiple sub-contractos.

–           Removal and disposal of existing concrete.

–           Supply and installation of new concrete work.

–           Full roadway reconstruction.

–           Subgrade and Base Stabilization.

–           Full depth reclamation (Foaming).

–           Milling and overlay on existing roadways.

–           New bike lane infrastructure.

–           Surface drainage realignment and underground trench work

–           Topsoil and sod placement.

–           New Streetlight installation.

–           Soil Cell and Low impact design initiative.

–           Installation of community features including benches.

–           Coordination with utility construction companies in the urban city environment.

–           Public engagement and traffic accommodation during construction.

–           Environmental and tree protection in urban environment.