Four-year project started in the spring of 2019, consisting of residential roadway rehabilitation work with a contract value of over 30 million dollars. The project boundaries are from 111 Avenue to 122 Avenue and from 89 street to 97 street.
Project Scope:
– Act as prime contractor for multiple sub-contractos.
– Removal and disposal of existing concrete.
– Supply and installation of new concrete work.
– Full roadway reconstruction.
– Subgrade and Base Stabilization.
– Full depth reclamation (Foaming).
– Milling and overlay on existing roadways.
– New bike lane infrastructure.
– Surface drainage realignment and underground trench work
– Topsoil and sod placement.
– New Streetlight installation.
– Soil Cell and Low impact design initiative.
– Installation of community features including benches.
– Coordination with utility construction companies in the urban city environment.
– Public engagement and traffic accommodation during construction.
– Environmental and tree protection in urban environment.