Four-year project started in the spring of 2019, consisting of residential roadway rehabilitation work with a contract value of over 30 million dollars. The project boundaries are from 111 Avenue to 122 Avenue and from 89 street to 97 street.
Project Scope:
- Act as prime contractor for multiple sub-contractos.
- Removal and disposal of existing concrete.
- Supply and installation of new concrete work.
- Full roadway reconstruction.
- Subgrade and Base Stabilization.
- Full depth reclamation (Foaming).
- Milling and overlay on existing roadways.
- New bike lane infrastructure.
- Surface drainage realignment and underground trench work
- Topsoil and sod placement.
- New Streetlight installation.
- Soil Cell and Low impact design initiative.
- Installation of community features including benches.
- Coordination with utility construction companies in the urban city environment.
- Public engagement and traffic accommodation during construction.
- Environmental and tree protection in urban environment.