Millwoods and South St. Albert Transit Centers

Transit CentersOwner              City of Edmonton and City of St. Albert

Both contracts started in 2019 and were completed in 2020. These projects consisted of building over 20000 square meters of new transit infrastructure in two Edmonton locations (St. Albert Trail and Campbell road and the other 66 Street and 28 Avenue). This work was valued at over 7 million dollars.

Project Scope:

–           Subgrade stabilization and gravel base preparation.

–           Supply and install new concrete curb, sidewalks and ramps.

–           Supply and install concrete road base

–           Supply and install asphalt.